9 Elms
Client: Anglian Architectural · Location: 9 Elms, Vauxhall, south London · Particulars: spraying to internal window frames and reception area cladding panels.
We completed on-site spraying works for LUCAS UK at 9 Elms, Vauxhall, on the south bank of the Thames. The scope covered two sets of finished surfaces that had to look uniform at handover: the internal faces of the window frames and the cladding panels lining the reception area.
Spraying in situ is the practical answer on a build like this. The frames are already glazed and fixed and the reception panels are already hung, so taking them away for a factory finish is not an option. Our technicians mask the glazing, walls and floors, prepare and degrease the existing surface, spot-prime any bare or damaged areas and then apply the new coating in controlled spray coats, so the frames and panels read as one even colour and sheen rather than a patchwork of touch-ups. The work is sequenced area by area to fit around the other trades finishing the building.
Vauxhall sits at the heart of our south London work. The same spray-finishing approach was used on our SLAM, Denmark Hill project for Frixos Metalworks, and the repair side of the service is described on our uPVC window frame repair page.
Services used: On-site spraying, Window repairs, Walls, cladding & panel repairs. Part of our surface repairs in London; see also our sectors page and get a quote.
Project Details
CLIENT
Anglian ArchitecturalÂ
PROJECT TYPE
Commercial

