Greenford Quay Phase 1 & 2
We previously completed surface repair works at Greenford Quay, phase 1 & 2.
Units; 500+
Particulars; Re spraying lift cars, french polishing to communal area woodwork, kitchen repairs.
Services used: Kitchen Repairs, Furniture Repairs & French Polishing. Part of our surface repairs in London.
Lift cars resprayed, woodwork French polished and kitchens repaired across 500-plus homes at Greenford Quay
Greenford Quay is a large residential development in Greenford, west London, built by Tide Construction. Sinclair Surfaces carried out the surface repair package across Phases 1 and 2, covering more than 500 units, with three distinct trades on one contract: respraying the lift cars, French polishing the woodwork in the communal areas, and repairing kitchens in the apartments.
The lift cars show what on-site spraying does on a scheme of this size. A lift car that has been scuffed and scratched through the build is masked and resprayed in situ, so there is no replacement of panels and no lift out of action for longer than the spray and cure. The communal woodwork was brought back by hand through our French polishing service, colour-matched and refinished in place rather than taken away, and the kitchen repairs dealt with the chips, scratches and marks that fitted kitchens pick up before handover.
On a development with hundreds of apartments, that combination keeps the snagging list moving: one specialist contractor covering lifts, joinery and kitchens, working to the site programme, with each repair made good where it stands. Greenford Quay sits alongside Sparrow Farm Drive, Feltham among our west London projects and is part of our surface repairs across London. Get a quote for a live site.
Project Details
CLIENT
Tide Construction
PROJECT TYPE
Residential

