SQP – Phase 1
We recently completed surface repair works at SQP Phase 1, Canary Wharf.
Units; 634
Particulars; French Polishing to internal flooring, spraying to internal frames, glass polishing.
French polishing, frame spraying and glass polishing at SQP Phase 1
SQP Phase 1 is a Berkeley Homes residential scheme at Canary Wharf, and across its 634 units Sinclair Surfaces was brought in to deal with the finishing damage that a build of that size leaves behind. The work fell into three disciplines, each carried out in the apartments with the fit-out in place.
Our polishers took on the internal timber flooring: scratches, dents and marks in the boards were filled, grain-matched by hand and refinished where they lay, the same craft described on our French polishing and wood floor repair pages. Internal frames were spray-finished in situ, masked and coated to a uniform factory-style finish without removing them, as set out on our on-site spraying page. Scratched glazing was polished back to clear by machine rather than replaced, which is the approach on our glass scratch removal page.
Working this way across hundreds of apartments keeps the handover programme moving: no units are taken out of sequence for replacements, and each repair is signed off as the technician leaves the plot. It is typical of the surface repair work we carry out for housebuilders across East London and the wider capital.
Services used: Glass Polishing & Repairs, Furniture Repairs & French Polishing. Part of our surface repairs in London.
Project Details
CLIENT
Berkeley Homes
PROJECT TYPE
Residential

