SQP Phase 2

Following successful completion of phase 1, we are now working on Phase 2 at SQP.

Units; 450

Particulars; Repairs to internal / external window frames, repairs to floors, baths and more. 

Services used: Bathroom Repairs, Window Repairs, Flooring Repairs.

Surface repairs across 450 apartments at South Quay Plaza, Phase 2

SQP is South Quay Plaza, Berkeley Homes’ residential towers at Canary Wharf. Sinclair Surfaces carried the surface repairs package through Phase 1 and were asked back for Phase 2: a further 450 units finished to the same standard, with the same finishing team dealing with the damage a tall, busy site leaves behind in completed apartments.

The particulars centred on three surfaces. Window frames, internal and external, were chipped, scratched and splashed during the later trades and were repaired in the opening and refinished to match. Floors marked under foot traffic and deliveries were filled, grain-matched and sealed in place rather than lifted, as on the wood floor repairs of Phase 1. Baths chipped at second fix were colour-matched and refinished so the bathroom stayed complete.

Every item was repaired where it stood. Nothing was removed, re-ordered or re-fitted, which is what keeps a high-rise handover programme on its dates: a chipped bath or a scored frame is put right on the day instead of becoming a replacement line on the snagging list.

South Quay Plaza is one of several Canary Wharf and Isle of Dogs schemes in our East London portfolio and part of our surface repairs across London. Get a quote for a live site.

Project Details

CLIENT

Berkeley Homes

PROJECT TYPE

Residential