Hartland Village Ph. 3

Scope of Works; Surface Repairs

Project Scope; Repairs to FED’s, Repairs to Kitchen Units & Worktops, Repairs to Internal Window Frames, Repairs to Internal Doors, Repairs to Radiators, Repairs to Brickwork.

Services used: Kitchen Repairs, Door Repairs, Window Repairs, Metalwork Repairs & Spraying.

Phase 3 at Hartland Village for St. Edward

Hartland Village is the St. Edward residential scheme in Hampshire where Sinclair Surfaces carried out the surface repairs on Phase 1 and Phase 2. Phase 3 continued the same package: a finishing team working plot by plot behind the later trades, repairing damage in place so that each home reaches its handover inspection on time.

The project scope was front entrance doors (FEDs), kitchen units and worktops, internal window frames, internal doors, radiators and brickwork. Front entrance doors and internal doors chipped and scuffed by deliveries were repaired and refinished in the frame. Kitchen units and worktops damaged while the kitchens went in were filled and colour-matched to the surrounding finish. Internal window frames marked at second fix were made good where they sat. Radiators scratched or dented during the build were repaired and refinished as part of our metalwork repairs, and chipped and damaged brickwork on the external elevations was repaired and tinted to match the surrounding bricks rather than cut out and replaced.

Three phases on one scheme is the kind of continuity that comes from repairs that hold and a programme that keeps to the housebuilder’s dates. Replacing a door, a worktop or a run of bricks means a lead time, a delivery and a second fit; repairing in place is finished on the day by one technician. Hartland Village is among the larger housebuilder schemes in our residential portfolio. Get a quote for a live site.

Project Details

CLIENT

St. Edward

PROJECT TYPE

Residential