Alperton Bus Garage

Scope of Works; Surface Repairs

Project Scope; Repairs to FED’s, Repairs to Flooring, Repairs to Internal Window Frames, Repairs to Internal Doors, Repairs to Radiators, Repairs to HIU Cupboards, Repairs to Ceramic Tiles, Repairs to Bathroom Cabinets.

Services used: Bathroom Repairs, Door Repairs, Window Repairs, Metalwork Repairs & Spraying. Part of our surface repairs in London.

Snagging repairs across every surface at Alperton Bus Garage

Alperton Bus Garage is a Telford Homes development in north-west London where Sinclair was brought in to carry out surface repairs across the development. The scope ran across almost every finished surface: front entrance doors (FEDs), internal doors and internal window frames, flooring, radiators, HIU cupboards, ceramic tiles and bathroom cabinets.

Each repair was done in place. Chips and scratches on doors, frames and cupboards were filled, colour-matched and refinished to the existing finish; damaged ceramic tiles were repaired rather than cut out and relaid; marked radiators were repaired and refinished; and flooring damage was repaired so the floors did not need lifting. Working this way keeps the original materials in the homes and avoids the lead times and access problems that come with reordering components late in a programme.

It is typical of the end-of-build work we do for housebuilders across London: one team that can deal with a door, a tile and a radiator in the same visit. See the sectors we work in, and if you have a development with snagging repairs outstanding, send us the details or call 020 3538 5845.

Project Details

CLIENT

Telford Homes

PROJECT TYPE

Residential