Tower Court

Client: Countryside Partnerships · Location: Tower Court, Clapton, east London · Units: 132 · Particulars: spraying external frames and cladding, glass polishing and surface repairs.

Tower Court is a 132-home scheme in Clapton, in the London Borough of Hackney, where Sinclair Surfaces was appointed by Countryside Partnerships. The scope was weighted towards the exterior: spraying external window frames and cladding in place, polishing scratched glass, and the run of general surface repairs that any new-build block picks up on the way to completion.

External frames and cladding panels arrive finished and then live through months of construction, so by completion they carry scratches, scuffs, chips and mismatched touch-ups. We mask, prepare and spray them on the building, matching the original colour and sheen so that repaired and original sections read as one finish, with no panels or frames taken out. Glass polishing removes scratches from installed glazing, typically from trades working around the windows, so units are kept rather than reglazed. The remaining repairs follow the usual pattern of filling, colour-matching and refinishing in place.

Working this way keeps a large scheme on programme and keeps good materials out of skips. Tower Court sits alongside our other east London projects for Countryside and the major housebuilders; see our surface repairs in East London page.

Services used: On-site spraying, Window repairs, Walls, cladding & panel repairs, Glass polishing & repairs. Part of our surface repairs in London; see also our sectors page and get a quote.

Project Details

CLIENT

Countryside

PROJECT TYPE

Residential